Estimation and Costing MCQs | Civil Engineering MCQs for Estimation and Costing
In this article, you will get all Estimation and Costing MCQs with answers for best practices for competitive exams to crack competitive exams will always update our article and add more and more MCQ so bookmark and share the civil experience site for future learning.
Here in civil experience best civil engineering website, you will get the best learning and study materials, article, pdf, ppt, reports, etc for Estimation and Costing and others too so must join a civil experience blog and learn every day
Maximum surface drying time for class C and Class D type plastic emulsion paint is
The correct answer for Maximum surface drying time for class C and Class D type plastic emulsion paint is 90 minutes.
Join Whatsapp Group
Join Now
If the optimistic time, most likely and pessimistic time for activity A are 4.6 and 8 respectively. What would be the expected time for completion of activity A?
If the optimistic time, most likely and pessimistic time for activity A are 4.6 and 8 respectively. Than expected time for completion of activity A is 6 days.
Which of the following activities is NOT included in cash flow?
ANSWER = [B] Estimating and costing activities
The rate of payment is made for 100 cu m (per % cu m) in case of
List of Civil Experience Excel Spreadsheet | |
---|---|
Collection of Civil Excel Spreadsheet | Click Here |
Advance Concrete Mix Design As Per IS | Click Here |
Concrete Mix Design as Per IS Code (Lite) | Click Here |
DESIGN OF ISOLATED RCC FOOTING | Click Here |
Combined Footing Design Excel Sheet | Click Here |
One Way Continue Slab Design Excel | Click Here |
One Way Simply Supported Slab Design | Click Here |
Design of Two Way Slab by EXCEL Sheet | Click Here |
Design Terrace Slab Excel Sheet Easy Way | Click Here |
Two Flight Stair Case With Chajja Design | Click Here |
Design of Three Flight Open Well Stair | Click Here |
Brick Mortar Calculation | Click Here |
Concrete Mix Design Quantity Calculation | Click Here |
ANSWER = [D] All the above
The rate of an item of work depends on
ANSWER = [D] All the above
The main factor to be considered while preparing a detailed estimate, is
ANSWER = [D] All the above
Pick up the correct statement from the following:
ANSWER = [D] All the above
Brick walls are measured in sq. m if the thickness of the wall is
ANSWER = [A] 10 cm
The plinth area of a building does not includes
ANSWER = [D] Area of cantilevered porch
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
ANSWER = [D] All the above