In this article, you will get all Estimation and Costing MCQs with answers for best practices for competitive exams to crack competitive exams will always update our article and add more and more MCQ so bookmark and share the civil experience site for future learning.

Estimation and Costing MCQ | Civil Engineering MCQ

Here in civil experience best civil engineering website, you will get the best learning and study materials, article, pdf, ppt, reports, etc for Estimation and Costing and others too so must join a civil experience blog and learn every day

Join us
LinkedIn | Google News | Telegram | Facebook | Instagram | Twitter | YouTube | Quora

Maximum surface drying time for class C and Class D type plastic emulsion paint is





ANSWER = [B] 90 minute

The correct answer for Maximum surface drying time for class C and Class D type plastic emulsion paint is 90 minutes.

Join Whatsapp Group Join Now

If the optimistic time, most likely and pessimistic time for activity A are 4.6 and 8 respectively. What would be the expected time for completion of activity A?





ANSWER= [B] 6 days
If the optimistic time, most likely and pessimistic time for activity A are 4.6 and 8 respectively. Than expected time for completion of activity A is 6 days.

Which of the following activities is NOT included in cash flow?





ANSWER = [B] Estimating and costing activities


The rate of payment is made for 100 cu m (per % cu m) in case of

Must need Excel Sheet for Civil Engineering and Structure design work. If you didn't download then you miss something important.
List of Civil Experience Excel Spreadsheet
Collection of Civil Excel Spreadsheet Click Here
Advance Concrete Mix Design As Per IS Click Here
Concrete Mix Design as Per IS Code (Lite) Click Here
DESIGN OF ISOLATED RCC FOOTING Click Here
Combined Footing Design Excel Sheet Click Here
One Way Continue Slab Design Excel Click Here
One Way Simply Supported Slab Design Click Here
Design of Two Way Slab by EXCEL Sheet Click Here
Design Terrace Slab Excel Sheet Easy Way Click Here
Two Flight Stair Case With Chajja Design Click Here
Design of Three Flight Open Well Stair Click Here
Brick Mortar Calculation Click Here
Concrete Mix Design Quantity Calculation Click Here





ANSWER = [D] All the above

The rate of an item of work depends on





ANSWER = [D] All the above

The main factor to be considered while preparing a detailed estimate, is





Join Youtube Chennel Join Now

ANSWER = [D] All the above

Pick up the correct statement from the following:





ANSWER = [D] All the above

Brick walls are measured in sq. m if the thickness of the wall is





ANSWER = [A] 10 cm

The plinth area of a building does not includes





ANSWER = [D] Area of cantilevered porch

If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by





ANSWER = [D] All the above